A 40 mile long distance footpath, and 21 shorter circular walks A Coventry Way Home
top-ops shimSearch ACW site
A 40 mile long distance footpath, and 21 shorter circular walks A Coventry Way Home ACW Contact us ACW Site Map ACW Community About ACW ACW Home
News Archive shim
Footpath Updates
Next Challenge
Latest Challenge Results
Route Details
Previous Challenges
21 Circular Walks
Accommodation & Refreshments
Geocaching
Volunteers
Contact Us
ACWA Overview
About ACW
Coffee Break
Links
Space for more Buttons

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

shim shim

ACWA Working Party

On 1-Dec-2010 a Working Party built a new bridge from Solihull to Warwickshire, crossing a stream south of Dorridge.

Solihull and Warwickshire vans delivering the
Solihull and Warwickshire vans delivering the "Kit" : 1-Dec-2010

December Achievements

The bridge was a project sponsored jointly by Solihull MBC and Warwickshire CC, being a bridge which crossed a stream from Solihull to the east and Warwickshire to the west of the boundary a few miles south of Dorridge.

The bridge allows a local path to be re-instated on the definitive route, instead of using an unofficial diversion which has been in use for many years.

Both authorities came and helped with the tasks.  We built a "Kit-Bridge", but on this occasion the kit was a set of timber planks cut to size, but leaving us to drill all bolt holes and make a 4 metre long (but narrow) four sleeper bridge.  A handrail was fitted, and waymarks erected by the bridge and at each end of the stretch of path.

More photos can be seen at the Microsoft Live website (Note: You may have to install Microsoft Silverlight when first invited to)

 

The bridge under construction : 1-Dec-2010
The bridge under construction : 1-Dec-2010

The finished bridge : 1-Dec-2010
The finished bridge : 1-Dec-2010

 

A day with freezing temperatures and snow on the ground, but a lot of sunny spells and only a few short snow showers.  

However we all enjoyed the work in the bracing conditions.

With 7 volunteers and 3 from the LA, the complete task was finished by 12:30.

As now traditional, we then retired to a local pub (The Railway Inn) for an excellent lunch

Plans

The next session planned is:

  Wednesday 19th January 2011 at 9:30 am to about 1:00 pm
Location: On the stretch of ACW between Old Waste Lane and the Greenway
Park at:

Old Waste Lane (GR 254 765)

Meet at:

Old Waste Lane or site 5

Task(s):

Install one new k/gate (Site 4 on the map) and replace one sleeper bridge (Site 5 on the map) 
  see Map for Details

 
Lots of tasks proposed for next year ... some may be announced at the AGM on 5-Dec
The expected 2011 dates will therefore below:

  • Wednesday 19-Jan-2011
  • Wednesday 16-Feb-2011
  • Wednesday 16-Mar-2011
  • Wednesday 20-Apr-2011
  • Wednesday 18-May-2011
  • Wednesday 15-Jun-2011 


  • Wednesday 20-Jul-2011
  • Wednesday 17-Aug-2011
  • Wednesday 21-Sep-2011
  • Wednesday 19-Oct-2011
  • Wednesday 16-Nov-2011 
  • Why not volunteer to join us whenever you can?

    Please contact Bob Carey on 024 7645 5251 for further information.
     


      back to top   

      

    A Coventry Way Home

    www.acoventryway.org.uk