Work Party 17 August 2011
Work Party News 17 August 2011 We replaced two stiles and installed a new sleeper bridge on Walk 1 on … Read more
Work Party News 17 August 2011 We replaced two stiles and installed a new sleeper bridge on Walk 1 on … Read more
Work Party News 20 July 2011 We replaced one stile on Millennium Way (MW), and installed a new kissing gate … Read more
Work Party News 15 June 2011 We replaced two stiles on Walk 1, Benton Green Lane to Broad Lane/Coventry … Read more
Work Party News 20 April 2011 We built a long bridge over a pond beside Truggist Lane, south of … Read more
The 2011 Challenge was a true team event. Before the day Bob Carey, ably assisted by John Green, persuaded Caroline and Lawrence at The Queen’s Head in Meriden to host the 2011 event.… Read more
Work Party News 16 March 2011 We installed two kissing gates, one pedestrian gate and an extra waymark post … Read more
Work Party News 16 February 2011 We installed a large metal pedestrian gate & another massive sleeper bridge at … Read more
Work Party News 19 January 2011 We replaced a stile with a kissing gate and built a new sleeper … Read more
Work Party News 1 December 2010 We built a new bridge from Solihull to Warwickshire, crossing a stream south … Read more
Work Party News 17 November 2010 We replaced a stile with a wooden kissing gate and a second stile … Read more